Iterations (timeboxes) should always be 30 days
The team determines iteration (timebox) length by dividing the total number of story points by the average velocity of the team
Iterations (timeboxes) should always be two weeks
The team should agree on the length of the iteration (timebox) taking the size and complexity of the project into consideration